Riverton Elementary Playground Improvements
Sector: Water Supply and Storage • Location: Riverton, Illinois, United States of America
Source: Dodge USA
Work will consist of removal of existing woodchip playground surfacing, milling and overlaying HMA pavement, drainage and grading, preparing subgrade for playground surfacing, PC Concrete Sidewalks, and removal and replacement of perimeter chain-link fencing and gates.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Residential, Manufacturing (Industrial)
- Location
- Riverton, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Riverton Elementary Playground Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work will consist of removal of existing woodchip playground surfacing, milling and overlaying HMA pavement, drainage and grading, preparing subgrade for playground surfacing, PC Concrete Sidewalks, and removal and replacement of perimeter chain-link fencing and gates. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Riverton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
