Riverview Ave Culvert Replacement REBID
Sector: Water Supply and Storage • Location: Eugene, Oregon, United States of America
Source: Dodge
Req. approx. 400 ft sed barr; 160 yd2 subg geotextile; 32ft 6 in san. sewer; 46 ft precast reinf. conc. box culvert; 75 ton agg. base; 100 ton ACP mixture; 103 ft conc. barrier; 930 ft paint pvmt. marking; 48 sf perm. signs; 58 ft 12 ductile water pipe; 2ea 12-in. gate valves.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Eugene, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Riverview Ave Culvert Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Req. approx. 400 ft sed barr; 160 yd2 subg geotextile; 32ft 6 in san. sewer; 46 ft precast reinf. conc. box culvert; 75 ton agg. base; 100 ton ACP mixture; 103 ft conc. barrier; 930 ft paint pvmt. marking; 48 sf perm. signs; 58 ft 12 ductile water pipe; 2ea 12-in. gate valves. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Eugene |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
