Riverview Park Dugout Replacement 3
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Field 3: Total of 2 dugouts 1. The existing dugouts will be removed by the City of North Augusta. The project consists of replacement with new dugouts according to the specifications in the Request for Proposals. 2. Dugouts shall be 30 x 8 . All steel construction using 3 O.D. Posts. Concrete slabs shall be 6 with turndown ends. All concrete to be 3000 PSI minimum at 28 days. Posts to be embedded
- Status
- Closed
- Sector
- Cement, Steel, Government, Manufacturing (Industrial), Commercial, Car parking, Automotive, Metal
- Location
- North Augusta, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Riverview Park Dugout Replacement 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Field 3: Total of 2 dugouts 1. The existing dugouts will be removed by the City of North Augusta. The project consists of replacement with new dugouts according to the specifications in the Request for Proposals. 2. Dugouts shall be 30 x 8 . All steel construction using 3 O.D. Posts. Concrete slabs shall be 6 with turndown ends. All concrete to be 3000 PSI minimum at 28 days. Posts to be embedded directly into the footing. 3. Roofing shall use 3 x 3 steel tubing with 6 roof overhang. 3 x 3: t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | North Augusta |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Steel, Government, Manufacturing (Industrial), Commercial, Car parking, Automotive, Metal |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
