Riverview Substation (DUPLICATE REPORT)
Sector: Power Generation (CCGT) • Location: Edmonton, Alberta, Canada
Source: Dodge USA
New substation in southwest Edmonton near the Anthony Henday Drive justeast of Maskekosihk Trail (formerly 184th Street) - Will be approximately 100 m by 100 m - Will include 2 240 kV/25 kV transformers - 4 240 kV circuit breakers - Associated switches and equipment - Installation of a chain link fence to enclose the new substation site - 2 adjacent transmission lines both approximately 70m in len
- Status
- Failure
- Sector
- Power Generation (CCGT), Road, Commercial
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Riverview Substation (DUPLICATE REPORT)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New substation in southwest Edmonton near the Anthony Henday Drive justeast of Maskekosihk Trail (formerly 184th Street) - Will be approximately 100 m by 100 m - Will include 2 240 kV/25 kV transformers - 4 240 kV circuit breakers - Associated switches and equipment - Installation of a chain link fence to enclose the new substation site - 2 adjacent transmission lines both approximately 70m in length to connect substation to AltaLink?s 1043L (to be renamed 1139L and 1164L) transmission line |
Budget |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Canada
- Site C Worker Accommodation
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Brock University's Marilyn I. Walker School of Fine and Performing Arts
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- Osgoode Hall Law School
- Toronto Airport Piers D and E Fixed Bridges
