Riverwalk Phase II
Sector: Commercial • Location: Bridgewater, Virginia, United States of America
Source: Dodge USA
Phase II of Riverwalk is the construction of a paver shared-use path starting at the western terminus of Riverwalk, Phase I, running along the southeastern side of Bridgeview Park, then parallel to West Bank Street until it connects to West Bank at the entrance to Bridgeview. Riverwalk, Phase II also installs a crosswalk between the Riverwalk path and an existing sidewalk on West Bank Street. The
- Status
- Closed
- Sector
- Commercial, Car parking, Road, Automotive, Government
- Location
- Bridgewater, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Riverwalk Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase II of Riverwalk is the construction of a paver shared-use path starting at the western terminus of Riverwalk, Phase I, running along the southeastern side of Bridgeview Park, then parallel to West Bank Street until it connects to West Bank at the entrance to Bridgeview. Riverwalk, Phase II also installs a crosswalk between the Riverwalk path and an existing sidewalk on West Bank Street. The Phase II path is 10 wide and approximately 950 linear feet in length. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Bridgewater |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Road, Automotive, Government |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
