Riverwalk Redevelopment Phase 1 Mixed-Use
Sector: Consumer Products • Location: San Diego, California, United States of America
Source: Dodge
The first phase will include 721 residential rentals units ranging from studios to three-bedroom units, in five buildings - 10% of the units will be designated affordable. The buildings will house retail on the first level along with an anchor grocer. In addition, four retail buildings will be located in the core of the development. There will be 100,000 square feet of retail and 25,000 square fee
- Status
- Prospective
- Sector
- Consumer Products, Commercial, Manufacturing (Industrial), Car parking, Residential, Automotive
- Location
- San Diego, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Riverwalk Redevelopment Phase 1 Mixed-Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The first phase will include 721 residential rentals units ranging from studios to three-bedroom units, in five buildings - 10% of the units will be designated affordable. The buildings will house retail on the first level along with an anchor grocer. In addition, four retail buildings will be located in the core of the development. There will be 100,000 square feet of retail and 25,000 square feet of office in this phase - Parking area estimated at 300,000 square feet - scope may change |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Manufacturing (Industrial), Car parking, Residential, Automotive |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
