Riverwalk Street Light Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Removal of the existing old style street lights along the Riverwalk and replacement with 44 new street lights that meet the new City standard. Work includes installing conduit and wiring. Design was completed in FY20. Budget includes adding string lights to the South Division Street bridge and Amphitheater Pedestrian Bridge.
- Status
- Prospective
- Sector
- Bridge, Government, Power Transmission, Power Generation (CCGT), Road, Commercial
- Location
- Salisbury, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Riverwalk Street Light Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of the existing old style street lights along the Riverwalk and replacement with 44 new street lights that meet the new City standard. Work includes installing conduit and wiring. Design was completed in FY20. Budget includes adding string lights to the South Division Street bridge and Amphitheater Pedestrian Bridge. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Salisbury |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Government, Power Transmission, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
