Rivian Georgia Electric Vehicle Manufacturing Plant
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Plant Services
Rivian Automotive, Inc. is building a new factory in Social Circle, Georgia, to produce its R2 SUV and R3 crossover. The plant will create 7,500 jobs and is planned to be constructed in two phases from 2026 to 2030, with a total production capacity of 400,000 vehicles annually.
- Status
- Prospective
- Sector
- Automotive, Manufacturing (Industrial), Commercial, Electric Vehicles (EVs)
- Location
- Social Circle, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Plant Services
ConstructChat
Ask ConstructChat about Rivian Georgia Electric Vehicle Manufacturing Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rivian Automotive, Inc. is building a new factory in Social Circle, Georgia, to produce its R2 SUV and R3 crossover. The plant will create 7,500 jobs and is planned to be constructed in two phases from 2026 to 2030, with a total production capacity of 400,000 vehicles annually. |
Original sector | Automotive Manufacturing |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Social Circle |
Source
Source | Plant Services |
URL |
More Details
Record type | Project |
Sector | Automotive, Manufacturing (Industrial), Commercial, Electric Vehicles (EVs) |
Article published date | 2025-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
