Rivian Maintenance Facility
Start · Texas · Last reported Mar 2024
Source: Dodge USA
Demo all existing site buildings and structures, construct PEMB shell buildings. No interior finish out, stub in utilities only, exterior lighting only. Tenant will provide drawings and interior finish out. Tenant will submit to TDLR for future
- Status
- Under Construction
- Sector
- Automotive, Commercial, Power Transmission, Metal, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rivian Maintenance Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demo all existing site buildings and structures, construct PEMB shell buildings. No interior finish out, stub in utilities only, exterior lighting only. Tenant will provide drawings and interior finish out. Tenant will submit to TDLR for future |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Power Transmission, Metal, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
