logo
ProjectClosed

Rivier Elementary School Sidewalk Replacement

One of 10,000+ projects Taiyo tracks in Saskatchewan.

Source: Dodge

Demolition and Removal: Remove and properly dispose of the existing sidewalk. Remove and properly dispose of the existing flower beds at the front entrance. Prepare the foundation for new concrete installation. Concrete Sidewalk Installation: Install a new 6-inch thick, 4-foot-wide concrete sidewalk totaling 140 linear meters. Ensure the new sidewalk is properly pinned to the school s foundation.

Status
Closed
Sector
Cement, Government, Car parking, Commercial, Automotive, Waste Processing and Treatment
Location
Spiritwood, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Rivier Elementary School Sidewalk Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rivier Elementary School Sidewalk Replacement” is an infrastructure initiative in the Cement sector, located in Spiritwood, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Demolition and Removal: Remove and properly dispose of the existing sidewalk. Remove and properly dispose of the existing flower beds at the front entrance. Prepare the foundation for new concrete installation. Concrete Sidewalk Installation: Install a new 6-inch thick, 4-foot-wide concrete sidewalk totaling 140 linear meters. Ensure the new sidewalk is properly pinned to the school s foundation. Ensure appropriate drainage and grading. Install six (6) roof drains beneath the sidewalk, each c...

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Spiritwood

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Government, Car parking, Commercial, Automotive, Waste Processing and Treatment

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project