logo

Riyadh – Qassim Independent Water Transmission Pipeline project

Sector: Road • Location: Ar Riyad, Saudi Arabia

Source: InfraPPPWorld

Project
Project In Tender

The project involves the development of the Riyadh–Qassim Independent Water Transmission Pipeline (IWTP), designed to supply reliable drinking water to the Riyadh and Al-Qassim regions in Saudi Arabia. It includes the construction of an 859 km long, bi-directional transmission pipeline with a capacity of 685,000 m³ per day, alongside a network of storage tanks (including six strategic tanks in Riy

Project Information FAQ

Project Information

4 Q
The project “Riyadh – Qassim Independent Water Transmission Pipeline project” is an infrastructure initiative in the Road sector, located in Ar Riyad, Saudi Arabia. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in tender

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development of the Riyadh–Qassim Independent Water Transmission Pipeline (IWTP), designed to supply reliable drinking water to the Riyadh and Al-Qassim regions in Saudi Arabia. It includes the construction of an 859 km long, bi-directional transmission pipeline with a capacity of 685,000 m³ per day, alongside a network of storage tanks (including six strategic tanks in Riyadh and 32 operational tanks along the route) to ensure consistent water delivery. The scheme is planned under a Build, Own, Operate, Transfer (BOOT) concession model spanning 35 years from commercial operation, expected to start in early 2030, and will integrate solar power to lower carbon emissions while relying on the grid for energy.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data