logo

RM Clayton Emergency Dewatering and Hauling

Sector: Chemical (Industrial) • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Complete

Constructed in 1965, the R.M. Clayton Water Reclamation Center (WRC), located in northwest Atlanta along the Chattahoochee River, provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gal

Project Information FAQ

Project Information

5 Q
The project “RM Clayton Emergency Dewatering and Hauling” is an infrastructure initiative in the Chemical (Industrial) sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Constructed in 1965, the R.M. Clayton Water Reclamation Center (WRC), located in northwest Atlanta along the Chattahoochee River, provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (MGD) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. The treatment process removes biological and chemical impurities from the wastewater in three phases: primary treatment, secondary treatment, and tertiary treatment. The primary treatment process begins with the removal of floatable and settleable solids. Next, biological treatment during the secondary treatment phase reduces the concentration of organic and chemical pollutants. Finally, tertiary treatment removes the remaining suspended solids, disinfects the treated water using ultraviolet radiation and increases dissolved oxygen concentrations before discharging to the Chattahoochee River. Biological solids removed during the wastewater treatment process are reduced in the digestion process before being dewatered and incinerated or hauled to a landfill. The biological solids handling systems in need of additional capacity in order to handle excessive grit and debris loading. Other WRCs may also be included.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data