logo

RM Clayton Ostara Nutrient Recovery System

Sector: Chemical (Industrial) • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Complete / Construction

Constructed in 1935, the RM Clayton Water Reclamation Center (WRC), located in northwest Atlanta along the Chattahoochee River, provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallon

Project Information FAQ

Project Information

5 Q
The project “RM Clayton Ostara Nutrient Recovery System” is an infrastructure initiative in the Chemical (Industrial) sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete / construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Constructed in 1935, the RM Clayton Water Reclamation Center (WRC), located in northwest Atlanta along the Chattahoochee River, provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (MGD) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. The purpose of this project is to improve nutrient (phosphorus and nitrogen) removal within the RM Clayton WRC. Enhanced nutrient removal will improve permit compliance, reduce chemical and operating costs, and provide a reusable byproduct. The WRC discharge permit requires the effluent to meet a total phosphorus limit. The plant employs a combination of chemical and biological phosphorus removal to meet this limit. The RM Clayton WRC dewatering cent rate has a high concentration of dissolved nutrients, specifically phosphorus and ammonia. The presence of these nutrients at high concentration causes unintentional struvite scale to form. The formation of struvite is currently providing a benefit to the plant, as phosphorus that would normally be recycled to the head of the plant is currently being removed with the plant’s dewatered sludge or via removal by adherence to the pipes in the form of struvite crystals. However, that same benefit results in underground and aboveground piping to be abandoned or removed and replaced on a regular basis increasing costs and introducing operational and compliance risk. The scope of this project includes: Designing and installing a Nutrient Recovery and Treatment System

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data