logo
ProjectComplete / Construction

RM Clayton WRC – Two Scroll Bowl Kits, Switch Gears, Emergency Generators

Sector: Chemical (Industrial) • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Constructed in 1965, the R. M. Clayton Water Reclamation Center (WRC) located in northwest Atlanta along the Chattahoochee River provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gall

Status
Closed
Sector
Chemical (Industrial), Commercial, Nuclear, Water Supply and Storage, Manufacturing (Industrial), Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Atlanta Watershed

ConstructChat

Ask ConstructChat about RM Clayton WRC – Two Scroll Bowl Kits, Switch Gears, Emergency Generators

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “RM Clayton WRC – Two Scroll Bowl Kits, Switch Gears, Emergency Generators” is an infrastructure initiative in the Chemical (Industrial) sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Participants

Sponsoring Agency

Status

Original status

complete / construction

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Constructed in 1965, the R. M. Clayton Water Reclamation Center (WRC) located in northwest Atlanta along the Chattahoochee River provides wastewater treatment for a service area that encompasses north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (mgd) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. The treatment process removes biological and chemical impurities from the wastewater in three phases: primary treatment, secondary treatment, and tertiary treatment. The primary treatment process begins with the removal of floatable and settleable solids. Next, biological treatment during the secondary treatment phase reduces the concentration of organic and chemical pollutants. Finally, tertiary treatment removes the remaining suspended solids, disinfects the treated water using ultraviolet radiation and increases dissolved oxygen concentrations before discharging to the Chattahoochee River. The biological solids that are removed during the wastewater treatment process are reduced in the digestion process before being dewatered and incinerated or hauled to a landfill. The biological solids handling systems in need of additional capacity in order to handle excessive grit and debris loading. The centrifuges at R.M. Clayton WRC are of the scroll bowl type. These centrifuges use a high rotational speed to separate solids from liquids. A helical screw conveyor continuously discharges the separated solids from the bowl. The scroll conveys the solids from the stationary zone where the wastewater enters to the dewatering beach where the solids are discharged. The scope of this project includes: Installing two spare scroll bowl kits for the sludge thickener centrifuges, Replacing obsolete switch gears, Providing emergency generators for the Blower Building

Budget

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Atlanta Watershed

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Commercial, Nuclear, Water Supply and Storage, Manufacturing (Industrial), Government

Article published date

2023-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project