logo

RM Clayton WRC Thickener Waste Activated Sludge Centrifuge

Sector: Commercial • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Complete / Construction

The RM Clayton Water Reclamation Center (WRC) is located on Bolton Road in northwest Atlanta along the Chattahoochee River. The facility provides wastewater treatment for a service area that encompasses the City of Atlanta primarily north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily ma

Project Information FAQ

Project Information

5 Q
The project “RM Clayton WRC Thickener Waste Activated Sludge Centrifuge” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete / construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The RM Clayton Water Reclamation Center (WRC) is located on Bolton Road in northwest Atlanta along the Chattahoochee River. The facility provides wastewater treatment for a service area that encompasses the City of Atlanta primarily north of I-20, a small portion of north Fulton County adjacent to Sandy Springs, and most of north DeKalb County. The facility is designed to treat an average daily maximum monthly flow of 122 million gallons per day (MGD) of wastewater for discharge to the Chattahoochee River under a National Pollutant Discharge Elimination System (NPDES) Permit. This project will provide a new Thickener Waste Activated Sludge (TWAS) centrifuge to provide back-up equipment for the dewatering process. This helps minimize build-up of biosolids in the system. The scope of this project includes: Installing a new TWAS centrifuge

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data