logo

RM of Browning Grid 700 Road Upgrades

Sector: Water Supply and Storage • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Completed

The project proposes to expand approximately 29 kilometers of the Grid 700 road and additional 7.7 kilometers of the Range road 2060 to increase its capacity for all vehicles including farm equipment and heavy haulers over the next 20 years, as well as upgrade the roads to comply with the Transportation Association of Canada (TAC) Design Guidelines and improve safety. The exact nature of the upgra

Status
Closed
Sector
Water Supply and Storage, Raw Materials, Automotive, Road
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about RM of Browning Grid 700 Road Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “RM of Browning Grid 700 Road Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project proposes to expand approximately 29 kilometers of the Grid 700 road and additional 7.7 kilometers of the Range road 2060 to increase its capacity for all vehicles including farm equipment and heavy haulers over the next 20 years, as well as upgrade the roads to comply with the Transportation Association of Canada (TAC) Design Guidelines and improve safety. The exact nature of the upgrades will be dependent on a geotechnical investigation of the current roads structure and the required future Level of Service which will be determined during the pre-design phase of the Project. The roads will be expanded by increasing the roads structure width and roads structure depth. The roads surface will remain as traffic gravel with one traffic lane in each direction, but it will be expanded by approximately 1 to 2 meters. The scope of work for the project includes upgrading the roads to primary weight roads dimensions (able to handle the weight of heavy trucks, including semi-trailer trucks, which is not the case now), expanding the roads by increasing its structure width and depth, re-establishing the cross-slope and road crown to provide better water drainage, road earthworks, and all associated works. Associated works could include hauling material to strengthen the current roads structure and improving the roads geometry.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Raw Materials, Automotive, Road

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project