RM of Foam Lake No. 276 - Landfill Decommissioning
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The main objective of the RM of Foam Lake No.276 - Landfill Decommissioning project (the Project) is to decommission the existing 4 ha landfill site. The landfill was shut down by the Ministry of the Environment in 2014. The Project scope includes a landfill environmental site assessment (Phase II), a closure action plan, and providing final cover for the landfill. Following the Project completio
- Status
- Closed
- Sector
- Waste Processing and Treatment, Raw Materials, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about RM of Foam Lake No. 276 - Landfill Decommissioning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the RM of Foam Lake No.276 - Landfill Decommissioning project (the Project) is to decommission the existing 4 ha landfill site. The landfill was shut down by the Ministry of the Environment in 2014. The Project scope includes a landfill environmental site assessment (Phase II), a closure action plan, and providing final cover for the landfill. Following the Project completion the site will be returned to agricultural land. The outcome is the reduction of pollutants going to groundwater/soil. The Project will result in an increased capacity to reduce and/or remediate soil and/or air pollutants. |
Original sector | Waste Management |
Budget |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
