RM of Invergordon No. 430 - Landfill Closure and Decommissioning
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Environmental site assessment studies were conducted and found the site to be contaminated. The main objective of the Project is to decommission the existing (approximate) 2.45 ha landfill site. This will be achieved by the removal of all recyclable materials, disposing of any blown refuse, decommissioning and removal of one (1) attendant building, and a final 3-layer soil cover over the entire la
- Status
- Closed
- Sector
- Waste Processing and Treatment, Commercial, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about RM of Invergordon No. 430 - Landfill Closure and Decommissioning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Environmental site assessment studies were conducted and found the site to be contaminated. The main objective of the Project is to decommission the existing (approximate) 2.45 ha landfill site. This will be achieved by the removal of all recyclable materials, disposing of any blown refuse, decommissioning and removal of one (1) attendant building, and a final 3-layer soil cover over the entire landfill waste cells, followed by establishing vegetation cover over the final soil cover to limit erosion and facilitate the return to natural land. |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
