RM of Laurier No. 38, Eugene’s Bridge Replacement
Sector: Steel • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The purpose of the project is to replace the 9.144 metre (30 foot) timber bridge over an unnamed tributary of Long Creek constructed in 1962 with large diameter steel culverts.
- Status
- Closed
- Sector
- Steel, Forest Products and Packaging, Bridge, Road, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about RM of Laurier No. 38, Eugene’s Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to replace the 9.144 metre (30 foot) timber bridge over an unnamed tributary of Long Creek constructed in 1962 with large diameter steel culverts. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Steel, Forest Products and Packaging, Bridge, Road, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
