logo

RM of Laurier No. 38, Eugene’s Bridge Replacement

Sector: Forest Products and Packaging • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Completed

The purpose of the project is to replace the 9.144 metre (30 foot) timber bridge over an unnamed tributary of Long Creek constructed in 1962 with large diameter steel culverts.

Status
Closed
Sector
Forest Products and Packaging, Road, Bridge, Metal, Steel, Government
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about RM of Laurier No. 38, Eugene’s Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RM of Laurier No. 38, Eugene’s Bridge Replacement” is an infrastructure initiative in the Forest Products and Packaging sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of the project is to replace the 9.144 metre (30 foot) timber bridge over an unnamed tributary of Long Creek constructed in 1962 with large diameter steel culverts.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Road, Bridge, Metal, Steel, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project