RM of Laurier No. 38, Todd’s Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

The purpose of the project is to replace the 6.96 meter timber bridge over an unnamed tributary of Long Creek constructed in 1962 with large diameter steel culverts. The bridge will be replaced with one galvanized steel culvert, where the culvert is 2700 mm in diameter, has a wall thickness of 2.8 mm, and is approximately 14 meters in length. The project will be taking place at the NW 09-6-17W2 on

Status
Closed
Sector
Steel, Forest Products and Packaging, Water Supply and Storage, Raw Materials, Bridge, Road, Waste Processing and Treatment, Metal, Government
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about RM of Laurier No. 38, Todd’s Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “RM of Laurier No. 38, Todd’s Bridge Replacement” is an infrastructure initiative in the Steel sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of the project is to replace the 6.96 meter timber bridge over an unnamed tributary of Long Creek constructed in 1962 with large diameter steel culverts. The bridge will be replaced with one galvanized steel culvert, where the culvert is 2700 mm in diameter, has a wall thickness of 2.8 mm, and is approximately 14 meters in length. The project will be taking place at the NW 09-6-17W2 on a road alignment controlled by the RM of Laurier. The land around the bridge is cultivated agricultural land. The gross drainage area affected by this tributary is 18 square kilometres. The timber bridge will be removed and any suitable material will be salvaged with the remaining materials at a waste hazardous disposal site in the RM of Lomond No. 36. The water may be temporary damned with earthen dike while work is being undertaken and a pump may be installed to ensure downstream flow is not impeded. An energy dissipation area will be installed if water is required to be pumped downstream. A culvert bed will be prepared with gravel and environmental matting used to stabilize the bank and the bank will be reseeded to grass.

Original sector

Roads, Bridges and Trade Infrastructure

Budget

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Steel, Forest Products and Packaging, Water Supply and Storage, Raw Materials, Bridge, Road, Waste Processing and Treatment, Metal, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project