RM of Marquis No. 191 - Landfill Decommissioning - SSA Keeler
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The project objective is to decommission and reclaim the landfill cell of the RM of Marquis No. 191, non-compliant with the best management practices for landfill construction. The landfill cell has a surface area of approximately 0.06 hectares (.Kml attached) and is currently closed and ready for decommissioning. Environmental Site Assessment Level II and the Corrective Action Plan have been alre
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Metal, Waste Processing and Treatment, Raw Materials, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about RM of Marquis No. 191 - Landfill Decommissioning - SSA Keeler
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project objective is to decommission and reclaim the landfill cell of the RM of Marquis No. 191, non-compliant with the best management practices for landfill construction. The landfill cell has a surface area of approximately 0.06 hectares (.Kml attached) and is currently closed and ready for decommissioning. Environmental Site Assessment Level II and the Corrective Action Plan have been already completed; therefore, the scope of the project include completing and implementing a Decommissioning and Reclamation plan that is acceptable to the Ministry of Environment’s Landfill Section. Decommissioning and Reclamation activities include the design and construction of the final engineered cover, storm water management, removal of existing infrastructure, recycling , metal, concrete , clean wood piles, installation of monitoring wells (3 already exist on Site), and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. Landfill will be converted agricultural land. Reclaimed landfill will be owned by the RM of Marquis No. 191 with the intended use of agricultural land. Decommissioning and reclamation of the proposed landfill cell will attenuate the generation of leachate which in turn increases capacity to reduce soil pollutants in line with the Environmental Quality Outcomes of the Green Infrastructure Stream of the ICIP. |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Metal, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
