logo
ProjectBid Results

RMNPP Superstructure Bridge Replacement

Bid results · New York · Last reported Dec 2023

Source: Dodge USA

Design, and construction support services for the replacement of three parallel bridge superstructures that carry traffic over the RMNPP. Project include upper structure carries NYS Route 104 (Lewiston Road), the middle structure carries Niagara Scenic Parkway (NB & SB) and lowest structure is closed to the public and serves as a maintenance access road for the New York Power Authority (NYPA). Des

Status
Closed
Sector
Bridge, Power Generation (CCGT), Road, Government, Commercial
Location
Lewiston, New York, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RMNPP Superstructure Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RMNPP Superstructure Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Lewiston, New York, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design, and construction support services for the replacement of three parallel bridge superstructures that carry traffic over the RMNPP. Project include upper structure carries NYS Route 104 (Lewiston Road), the middle structure carries Niagara Scenic Parkway (NB & SB) and lowest structure is closed to the public and serves as a maintenance access road for the New York Power Authority (NYPA). Design, and construction support services for the replacement of three parallel bridge superstructur...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Lewiston

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Power Generation (CCGT), Road, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project