RNG Project at Pilgrim’s Pride Facility
Sector: Water Supply and Storage • Location: Sumter, South Carolina, United States
Source: COMPRESSORtech2
The RNG project at Pilgrim’s poultry processing facility in Sumter, South Carolina, involves converting wastewater biogas into renewable natural gas (RNG) for pipeline injection. This initiative aims to reduce greenhouse gas emissions and improve local air and water quality while utilizing waste streams for energy production.
- Status
- Closed
- Sector
- Water Supply and Storage, Biomass, Natural Gas, Power Generation (CCGT)
- Location
- Sumter, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- COMPRESSORtech2
ConstructChat
Ask ConstructChat about RNG Project at Pilgrim’s Pride Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The RNG project at Pilgrim’s poultry processing facility in Sumter, South Carolina, involves converting wastewater biogas into renewable natural gas (RNG) for pipeline injection. This initiative aims to reduce greenhouse gas emissions and improve local air and water quality while utilizing waste streams for energy production. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Sumter |
Source
Source | COMPRESSORtech2 |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Natural Gas, Power Generation (CCGT) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
