ROAD ENGINEERING
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The studies that the loan will finance consist of two parts: (a) detailed engineering of roads, bridges and culverts, including economic analysis and preparation of tender documents and cost estimates, and (b) preparation of a highway maintenance and betterment program, including the improvement of the highway maintenance organization. The first part of the study would cover (a) five primary road
- Status
- Closed
- Sector
- Road, Government
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ROAD ENGINEERING
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The studies that the loan will finance consist of two parts: (a) detailed engineering of roads, bridges and culverts, including economic analysis and preparation of tender documents and cost estimates, and (b) preparation of a highway maintenance and betterment program, including the improvement of the highway maintenance organization. The first part of the study would cover (a) five primary road sections, (b) two secondary road sections, and (c) 16 bridges and 41 culverts. The road sections require substantial improvements in design and alignment and the pavement is to be rehabilitated and upgraded. The bridges and culverts are intended to replace structures which have already collapsed or have insufficient capacity. The second part of the study will define current highway maintenance requirements, assign priorities to road sections in need of upgrading, and identify ways to strengthen the maintenance organization, including improving personnel training and cost accounting. |
Original sector | Transportation |
Location
Country | Tunisia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
