ROAD II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The proposed loan would help finance: (a) road construction: (i) a four-lane freeway (12.2 km) between Tampere and Kulju with approach roads; (ii) the Kyronsalmi bridge at Savonlinna, with adjacent road sections; (b) asphalt paving of about 2,000 km of roads during 1966 and 1967; (c) final engineering and design by consultants of about 350 km of roads to be improved or constructed as part of the 1
- Status
- Closed
- Sector
- Road, Bridge, Government
- Location
- Finland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ROAD II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed loan would help finance: (a) road construction: (i) a four-lane freeway (12.2 km) between Tampere and Kulju with approach roads; (ii) the Kyronsalmi bridge at Savonlinna, with adjacent road sections; (b) asphalt paving of about 2,000 km of roads during 1966 and 1967; (c) final engineering and design by consultants of about 350 km of roads to be improved or constructed as part of the 1966-1975 highway program. |
Original sector | Transportation |
Location
Country | Finland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
