Road Infrastructure Project in Wucheng District, Zhangzhou City
Sector: Bridge • Location: Andhra Pradesh, China
Source: World Bank Group
The project entails:
- The G344 Yucheng section (Caoyu Road) adopts the standard design of secondary roads with a design speed of 60 km/h and a total length of 24.944 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route.
- G311 North Outer Ring (Jiguang Expressway East
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project entails: 1. The G344 Yucheng section (Caoyu Road) adopts the standard design of secondary roads with a design speed of 60 km/h and a total length of 24.944 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 2. G311 North Outer Ring (Jiguang Expressway East Entrance-Shanghang High-speed Rail Intersection Section) adopts the design of the first-class highway, with a design speed of 80 km/h and a total length of 5.45 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 3, G311 Zhangzhou section of the first-grade road reconstruction road, design speed of 80 km / h, the total length of the route is 20.9 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 4. S250 (S236) Yan Zhanglu Chengcheng to Zhangcun reconstruction project (first contract section) adopts two-way two-lane secondary road standard design with a design speed of 60 km/h and a total length of 5.754 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 5. Niuji Vortex Bridge and wiring project. With a secondary road, the design speed is 60 km / h. The total length of the Vortex Bridge is 0.4 kilometers, and the length of the two sides is about 4.53 kilometers. The scope of the project includes road works, bridges, culverts and traffic works and facilities along the route. SPV is Zhangzhou Qihang Traffic Construction Co., Ltd., a JV between the sponsor Hebei Construction Group Co., Ltd. (90 %) and the government company Zhangzhou City Lucheng District Traffic Investment Co., Ltd. (10 %) . Total project cost is $ 235.87 million. The BOT+TOT concession has a duration of 15 years.Financial close took place on July 18, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=23daf9ea5df242039cb46940bac0fdf0 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
