logo

Road Infrastructure Project in Wucheng District, Zhangzhou City

Active · China

Source: World Bank Group

Project
Active

The project entails:

  1. The G344 Yucheng section (Caoyu Road) adopts the standard design of secondary roads with a design speed of 60 km/h and a total length of 24.944 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route.
  2. G311 North Outer Ring (Jiguang Expressway East
Status
Prospective
Sector
Commercial, Road, Waste Processing and Treatment, Bridge, Rail, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Road Infrastructure Project in Wucheng District, Zhangzhou City

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Road Infrastructure Project in Wucheng District, Zhangzhou City” is an infrastructure initiative in the Commercial sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails: 1. The G344 Yucheng section (Caoyu Road) adopts the standard design of secondary roads with a design speed of 60 km/h and a total length of 24.944 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 2. G311 North Outer Ring (Jiguang Expressway East Entrance-Shanghang High-speed Rail Intersection Section) adopts the design of the first-class highway, with a design speed of 80 km/h and a total length of 5.45 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 3, G311 Zhangzhou section of the first-grade road reconstruction road, design speed of 80 km / h, the total length of the route is 20.9 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 4. S250 (S236) Yan Zhanglu Chengcheng to Zhangcun reconstruction project (first contract section) adopts two-way two-lane secondary road standard design with a design speed of 60 km/h and a total length of 5.754 km. The construction content includes roads and ancillary supporting infrastructure, drainage works, bridge and culvert works, earth and stone works, and facilities along the route. 5. Niuji Vortex Bridge and wiring project. With a secondary road, the design speed is 60 km / h. The total length of the Vortex Bridge is 0.4 kilometers, and the length of the two sides is about 4.53 kilometers. The scope of the project includes road works, bridges, culverts and traffic works and facilities along the route. SPV is Zhangzhou Qihang Traffic Construction Co., Ltd., a JV between the sponsor Hebei Construction Group Co., Ltd. (90 %) and the government company Zhangzhou City Lucheng District Traffic Investment Co., Ltd. (10 %) . Total project cost is $ 235.87 million. The BOT+TOT concession has a duration of 15 years.Financial close took place on July 18, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=23daf9ea5df242039cb46940bac0fdf0

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Road, Waste Processing and Treatment, Bridge, Rail, Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project