Road Maintenance & Rehabilitation 2 Project
Closed · Poland
Source: World Bank Group
The Second Road Maintenance and Rehabilitation Project aims at improving the effectiveness of Poland's national road rehabilitation, and maintenance systems, with emphasis on quality, efficiency, financial viability, and road user satisfaction. The project includes two components: 1) The General Directorate for National Roads and Motorways (GDDKiA) road maintenance and rehabilitation program; and,
- Status
- Closed
- Sector
- Road, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Road Maintenance & Rehabilitation 2 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Road Maintenance and Rehabilitation Project aims at improving the effectiveness of Poland's national road rehabilitation, and maintenance systems, with emphasis on quality, efficiency, financial viability, and road user satisfaction. The project includes two components: 1) The General Directorate for National Roads and Motorways (GDDKiA) road maintenance and rehabilitation program; and, 2) implementation of GDDKiA management information system (MIS). The road maintenance and rehabilitation program has been prepared by GDDKiA within the framework of the 2005 budget. For the period beyond 2005 the proposed program is expected to be well balanced between maintenance-rehabilitation, strengthening and reconstruction of existing roads, together with new construction of motorways and expressways. Its financing will be from both, domestic and foreign sources. The second component - GDDKiA MIS - will support the implementation of a modem management and information system (MIS) within GDDKiA, that will properly integrate all data necessary to efficiently carry out its activities (including technical, financial, human resources, and contract related data) and support all core functions and decision-making processes within GDDKiA. This Component will include, but not be limited to: a) development of an Enterprise Resource Planning (ERP), consisting of integrated modules such as planning, controlling, finances, fixed assets management, human resources management, and project management; b) development of a system workflow for the management of documents and information; and, c) procurement of any related system, supporting equipment, and hardware/software. |
Original sector | FY17 - Transportation |
Budget |
Location
Country | Poland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
