ROAD MAINTENANCE
Closed · Mali
Source: World Bank Group
The project would consist of: (i) a two and a half year program of routine maintenance of 6,600 km of national, regional and feeder roads including strengthening of the Equipment Service and Training Center of the Ministry of Transport and Public Works; (ii) periodic maintenance of 680 km of paved roads; and of 220 km of gravel roads by force account and contractor; (iii) vehicle axle-load control
- Status
- Closed
- Sector
- Road, Government
- Location
- Mali
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ROAD MAINTENANCE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would consist of: (i) a two and a half year program of routine maintenance of 6,600 km of national, regional and feeder roads including strengthening of the Equipment Service and Training Center of the Ministry of Transport and Public Works; (ii) periodic maintenance of 680 km of paved roads; and of 220 km of gravel roads by force account and contractor; (iii) vehicle axle-load control; and (iv) assistance to the Ministry of Transport and Public Works in setting up a transport data collection unit. The project is aimed at protecting the small but significant institutional gains made to date in the sector, as well as preventing deterioration in maintenance equipment and the road network itself, while discussions between the Government, the IMF and the Association proceed on a request for assistance in preparing an overall plan for reform of the economy, including financing of road maintenance. The main project risk would be the failure of the financial arrangements concerning the Road Fund. Should sufficient funds not be forthcoming, road maintenance operations would have to be reduced, either in extent or in duration. |
Original sector | Transportation |
Location
Country | Mali |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mali
- Support to the dialog and reconciliation process in Mali
- Dakar - Bamako Standard Gauge Railway (Senegal section)
- Bamako-Niamey Road Missing Links in Mali
- Mako - Dialocoto Road
- Mali - Development Programme for the Special Agro-Industrial Processing Zone of Koulikoro and Semi-Urban Bamako Regions (PDZSTA-BK)
- Mali - Project to Widen the Carrefour de la Paix - Woyowayanko Bridge - Point Y Urban Road Section in Bamako
- Mali - The Irrigation Development Program in Bani Basin and Selingue (PDI-BS)–Phase I
- Mali - Sevare-Gao Trans-Saharan Road Project
