Road Rehabilitation and Maintenance Project
One of 2,237 projects Taiyo tracks in Zambia.
Source: World Bank Group
The Government of Zambia (GRZ) is currently completing the first major Road Sector Investment Program, called ROADSIP. As a next step and based on the successes of ROADSIP I the GRZ prepared a second program, called RODSIP 11. This is a focused ten-year program (2004-2013) to reach the point where the maintenance backlogs are generally removed and the road sector can focus mostly on routine and pe
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Bridge, Seaport, Hotel, Government
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Road Rehabilitation and Maintenance Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Government of Zambia (GRZ) is currently completing the first major Road Sector Investment Program, called ROADSIP. As a next step and based on the successes of ROADSIP I the GRZ prepared a second program, called RODSIP 11. This is a focused ten-year program (2004-2013) to reach the point where the maintenance backlogs are generally removed and the road sector can focus mostly on routine and periodic maintenance activities. A major part of this program is to complete institutional changes that will result in both the development of a road user charging system that will over the same time expand to generate the required finding for the road sector locally and a focused road infrastructure, traffic and safety management. The project has the following four components: Component 1) The civil works component will focus on the priority needs for road maintenance and rehabilitation for the period of 2004-07 within the core road network. The program is inclusive of ongoing works, and will include inter-territorial trunk, territorial main, district roads, primary feeder roads, urban roads, and tourist roads in all provinces of the country. Component 2) Technical assistance for carrying out feasibility studies, engineering design and supervision of maintenance and rehabilitation works for Component 1, and to provide support to complete the preparatory activities for the next phase. Component 3) Technical assistance and training in the areas of policy support, implementation support, and institutional development. The strong focus of this project is to provide support to the Government in implementation of the Transport Policy and the new institutional framework including the creation of three new agencies in the road sector. The main elements of the component will include: Policy Support, Implementation Support, Institutional Development, Monitoring and Evaluation. Component 4) This component is aimed at providing continued support for improving physical access for the poor in order to promote their economic and social development. The main sub-components are as follows: Community Transport Infrastructure, Intermediate Means of Transport, and Canals and Waterways. |
Original sector | FY17 - Public Administration,FY17 - Transportation |
Budget |
Location
Country | Zambia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Bridge, Seaport, Hotel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Zambia
- Venturing into Milk Processing
- Sale of Majoru Investments Limited
- Shangombo Sugar Project
- Manufacture of Loose Red Passion Tea into Tea bags for Local and Export Market
- Reliable Supply of Beef and Pork to Local and Foreign Shops
- Umlimi Char-Briquettes Project
- Kashitu farm estate
- Tomato and Vegetable Growing Project
