Road Upgrading - Circular Road and Depot Road (AP-MCW-23154)
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Project consist of local road upgrades and resurfacing in the Town of Daniel’s Harbour. The scope of the project includes the asphalt resurfacing on Circular Road and a portion of Depot Road. The project aims to improve the quality of the road infrastructure and reduce the amount of maintenance required to maintain a suitable driving surface for the public.
- Status
- Closed
- Sector
- Seaport, Road, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Road Upgrading - Circular Road and Depot Road (AP-MCW-23154)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consist of local road upgrades and resurfacing in the Town of Daniel’s Harbour. The scope of the project includes the asphalt resurfacing on Circular Road and a portion of Depot Road. The project aims to improve the quality of the road infrastructure and reduce the amount of maintenance required to maintain a suitable driving surface for the public. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Seaport, Road, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
