Road
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge
ScopeTownship of Cleveland, grader shed concrete floor and footing. 20 x 48 with a 18 x 16 perimeter grade beam, with 2 of high density foam vertically around the perimeter. Grade beam must leave 10 x 10 continuous square consisting of four 5 rebar suspended in the center of the grade beam. 6 floor with 5 rebar on 24 centers tied and suspended at all cross joints. 6 mil vapor retarder under all co
- Status
- Closed
- Sector
- Commercial, Road, Government, Steel, Cement
- Location
- Stratford, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ScopeTownship of Cleveland, grader shed concrete floor and footing. 20 x 48 with a 18 x 16 perimeter grade beam, with 2 of high density foam vertically around the perimeter. Grade beam must leave 10 x 10 continuous square consisting of four 5 rebar suspended in the center of the grade beam. 6 floor with 5 rebar on 24 centers tied and suspended at all cross joints. 6 mil vapor retarder under all concrete. 4000 psi concrete mix with a 4 slump. MUST be a mono pour. Cure sealed on all top surfaces. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Stratford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government, Steel, Cement |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
