ROAD
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project consists of: (a) the detailed engineering for the reconstruction to bituminous paved standard of the Bujumbura-Mutambara road (76 km); (b) the detailed engineering for limited improvements to, and gravel surfacing of, the Mutambara-Nyanza Lac road (45 km); and (c) a study of improvements required in road maintenance and of selected betterment works on the Gitega-Cankuzo-Tanzanian borde
- Status
- Closed
- Sector
- Road, Government
- Location
- Burundi
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ROAD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (a) the detailed engineering for the reconstruction to bituminous paved standard of the Bujumbura-Mutambara road (76 km); (b) the detailed engineering for limited improvements to, and gravel surfacing of, the Mutambara-Nyanza Lac road (45 km); and (c) a study of improvements required in road maintenance and of selected betterment works on the Gitega-Cankuzo-Tanzanian border road (164 km). |
Original sector | Transportation |
Location
Country | Burundi |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Burundi
- Burundi - The Job Creation Programme Support Project
- Burundi - Nyakararo-Mwaro-Gitega Road (RN18) Upgrade and Asphalting Project/Phase II – Kibumbu-Gitega (Mweya) - (24 km)
- Lake Tanganyika Transport Corridor
- Programme to support the decentralisation and fight against poverty
- Bujumbura Lake Port Upgrading
- Dar es Salaam - Chalinze - Morogoro Road Capacity Upgrade
- Bujumbura - Rumonge (RN3) Road Section
- Kayanza - Bugarama Road
