ROADS-EARTHQUAKE REC
Sector: Road • Location: Peru
Source: World Bank Group
The proposed project would include: (a) the reconstruction of selected roads/road sections, (b) the preparatory feasibility study and engineering, (c) technical assistance for road maintenance and betterment, and (d) interest and commitment charges over a five-year period.
- Status
- Closed
- Sector
- Road, Government
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ROADS-EARTHQUAKE REC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project would include: (a) the reconstruction of selected roads/road sections, (b) the preparatory feasibility study and engineering, (c) technical assistance for road maintenance and betterment, and (d) interest and commitment charges over a five-year period. |
Original sector | Transportation |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Peru
- Longitudinal de La Sierra - Tramo 2
- Costa Sierra Section 1B
- Via Expressa Sur
- Autopista del Sol II
- Costa Sierra: Ovalo-Chancay-Huaral-Acos Stretch
- Vias Nuevas de Lima Toll Road Concession
- Consorcio Transmantaro S.A.
- Villa María Hospital; Callao Hospital; Trecca Tower Medical Center; and Distribution Centers
