logo
ProjectRepaying

Roads Reconstruction and Upgrading Project

One of 4,035 projects Taiyo tracks in Azerbaijan.

Source: European Bank for Reconstruction and Development (EBRD)

The Roads Reconstruction and Upgrading Project was originally approved by EBRD’s Board in 2011 and provided a loan to the Republic of Azerbaijan for upgrading of sections of roads by the Azeri Roads Service (now renamed Azeravtoyol). Disbursement of the funds is allocated in tranches, with separate due diligence and Board approval for each tranche. Tranche I was approved in November 2011 and is be

Status
Under Construction
Sector
Road, Residential, Commercial, Government
Location
Azerbaijan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Roads Reconstruction and Upgrading Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Roads Reconstruction and Upgrading Project” is an infrastructure initiative in the Road sector, located in Azerbaijan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Roads Reconstruction and Upgrading Project was originally approved by EBRD’s Board in 2011 and provided a loan to the Republic of Azerbaijan for upgrading of sections of roads by the Azeri Roads Service (now renamed Azeravtoyol). Disbursement of the funds is allocated in tranches, with separate due diligence and Board approval for each tranche. Tranche I was approved in November 2011 and is being implemented. Tranche IIA was approved in November 2013 but not disbursed. Both of these tranches involved resurfacing and upgrading of existing two lane corridors in largely rural areas. This proposed tranche will reallocate the funds from Tranche IIA and add the unused portion of the loan to finance the upgrading of a road section in northwest Azerbaijan. This new tranche of the loan has been categorised A and the EBRD Board date is 30 November 2016. The total length of these roads is around 130 km and the Project involves upgrading an existing two lane single carriageway road to a dual two lane carriageway standard.  This upgrading will be achieved, partly by building a new carriageway alongside the existing carriageway in sections where there is no or little road-side development.  In sections where the existing road goes through villages and other areas where there is residential and/or business development on both sides of the existing road, the design provides for new 4 lane bypasses, to skirt around this development.  Out of the total length of around 130 km, the parallel widening will be carried out in 8 sections having a total length of around 59 km.  Six bypass sections will have a total length of around 71.5 km. There is a Project Summary Document available for this project Environmental Impact Assessment (EIA): Azeri | English Non-Technical Summary (NTS): Azeri | English Environmental and Social Action Plan (ESAP): Azeri | English Stakeholder Engagement Plan: Azeri | English Resettlement Action Plan: Azeri | English Full ESIA documentation is available locally at: Environmental or social enquiries: Mr. Arastun Quliyev Social Specialist, PIU4 Azeravtoyol OJSC (Baku Head Office) [Binaqai dstr., Bilajari settlement, R.Ismayilov str. 2025, Baku, Azerbaijan, AZ1117] Arastun.Quliyev@azeravtoyol.gov.az

Original sector

Transport

Location

Country

Azerbaijan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Residential, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project