ROADS
One of 739 projects Taiyo tracks in Lesotho.
Source: World Bank Group
The proposed project consists of the engineering, construction and reconstruction of (a) a 77-mile section of the main North-South road which parallels Basutoland's western border and (b) one feeder road 17 miles long. The Morse mission of 1959 gave the highest priority to raising the most heavily traveled main roads in the territory to fully graveled all-weather standards, being convinced that re
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Government
- Location
- Lesotho
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ROADS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of the engineering, construction and reconstruction of (a) a 77-mile section of the main North-South road which parallels Basutoland's western border and (b) one feeder road 17 miles long. The Morse mission of 1959 gave the highest priority to raising the most heavily traveled main roads in the territory to fully graveled all-weather standards, being convinced that reduced transport costs and savings in maintenance expenditures would fully justify the investment. In order, however, to obtain the full benefit of the investment in main roads, feeder roads also needed to be improved. |
Original sector | Transportation |
Location
Country | Lesotho |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Lesotho
- Lesotho - Lowlands Rural Water Supply and Sanitation Project
- Neo 1 Solar Lesotho
- Lesotho rural solar electrification mini-grids
- Lesotho Highlands Water Project (LHWP) Phase II
- Lesotho - Mpharane-Bela Bela Road Project
- Lesotho - Two Rural Roads Study
- Oxbow-Mokhotlong Road (ADF)
- Masianokeng-Mafeteng/Roma Roads Rehabilitation
