ROADS
One of 3,348 projects Taiyo tracks in Uganda.
Source: World Bank Group
The project consists of: (1) the reconstruction to a paved surface of the main road from Mbarara of Katunguru, totalling about 70 miles; (2) the reconstruction to a gravel surface of three short feeder roads totalling about 7 miles; (3) the construction of two tea roads totalling about 24 miles; (4) the detailed engineering and supervision of construction of the above roads; and (5) the detailed e
- Status
- Closed
- Sector
- Road, Government
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ROADS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (1) the reconstruction to a paved surface of the main road from Mbarara of Katunguru, totalling about 70 miles; (2) the reconstruction to a gravel surface of three short feeder roads totalling about 7 miles; (3) the construction of two tea roads totalling about 24 miles; (4) the detailed engineering and supervision of construction of the above roads; and (5) the detailed engineering of 6 main and 10 feeder roads totalling approximately 460 miles. All of these roads form an integral part of the road program contained in the Government's Five Year Development Plan and were found by the recent Bank economic mission to be of high priority. |
Original sector | Transportation |
Location
Country | Uganda |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Uganda
- Kampala-Jinja Expressway Phase I
- Uganda - Road Sector Support Project
- Uganda - Community Agricultural Infrastructure Improvement Programme - Project 1 (CAIIP-P1)
- Uganda - Kabale-Lake Bunyonyi/Kisoro-Mgahinga Roads Upgrading Project
- Engie's Mini-grid projects
- EASTERN AFRICA TRANSPORT CORRIDOR
- Isimba Hydropower Project
- New Bridge across River Nile at Jinja
