Roadshark Surface Mount Electric Spike Barrier Sys Modified
Closed · Colorado · Last reported Sep 2024
Source: Dodge USA
Brand name modified vehicle control kit for a Roadshark surface mount electric (SME) spike barrier system and its associated parts and 12 month warranty .
- Status
- Closed
- Sector
- Mass Transit, Commercial, Power Generation (CCGT), Road, Rail, Automotive
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Roadshark Surface Mount Electric Spike Barrier Sys Modified
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Brand name modified vehicle control kit for a Roadshark surface mount electric (SME) spike barrier system and its associated parts and 12 month warranty . |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Commercial, Power Generation (CCGT), Road, Rail, Automotive |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
