Roadway and Infrastructure Improvements - Regalo Road
Sector: Water Supply and Storage • Location: Saint Augustine, Florida, United States of America
Source: Dodge
The purpose of this IFB is for a Contractor to provide all labor, materials, equipment, and transportation necessary to complete all work to construct roadway, sidewalk, drainage, and utility improvements along the Regalo Road corridor. The existing roadway will be milled and resurfaced from US 1 to the Palencia Elementary School driveway and include a sidewalk and drainage improvements. The exist
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Government, Power Transmission, Waste Processing and Treatment, Commercial, Car parking, Power Generation (CCGT), Automotive
- Location
- Saint Augustine, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Roadway and Infrastructure Improvements - Regalo Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this IFB is for a Contractor to provide all labor, materials, equipment, and transportation necessary to complete all work to construct roadway, sidewalk, drainage, and utility improvements along the Regalo Road corridor. The existing roadway will be milled and resurfaced from US 1 to the Palencia Elementary School driveway and include a sidewalk and drainage improvements. The existing roadway will be reconstructed from the Palencia Elementary School driveway to Palencia Villag... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Saint Augustine |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Government, Power Transmission, Waste Processing and Treatment, Commercial, Car parking, Power Generation (CCGT), Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
