Roadway lighting PPP project in Ensenada
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The project entails the replacement of older, less efficient lighting technology with the high efficiency LED luminaires. The investment is expected to reduce Ensenada's electricity consumption by 260 million kWh over the life of the project and generate cost savings to the municipality in the form of a of 59 percent reduction in electricity expenses.
- Status
- Closed
- Sector
- Power Generation (CCGT), Road
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Roadway lighting PPP project in Ensenada
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | financial close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the replacement of older, less efficient lighting technology with the high efficiency LED luminaires. The investment is expected to reduce Ensenada's electricity consumption by 260 million kWh over the life of the project and generate cost savings to the municipality in the form of a of 59 percent reduction in electricity expenses. |
Original sector | Social & Health |
Procurement method | |
Budget |
Location
Country | Mexico |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
