Roadway Milling
Sector: Commercial • Location: Darlington, Wisconsin, United States of America
Source: Dodge USA
CTH K from STH 23 East to Red Rock Rd. (approximately 1.8 miles) milling 1.5" of existing roadway as specified, and supplying and laying 3" mat (approximately 3,900 Tons) of Hot Mix Asphalt, and shouldering. A State of Wisconsin Type E-1 design mix in specified.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | CTH K from STH 23 East to Red Rock Rd. (approximately 1.8 miles) milling 1.5" of existing roadway as specified, and supplying and laying 3" mat (approximately 3,900 Tons) of Hot Mix Asphalt, and shouldering. A State of Wisconsin Type E-1 design mix in specified. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
