Roadway with Associated Sidewalk Curb Ramps Striping
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
Construction of approximately 7,600 linear feet LF of roadway with associated sidewalk, curb ramps, striping, and railroad crossing. This includes all earthwork and revegetation. Construction of approximately 7,500 linear feet LF of power and telecommunication duct bank with associated manholes. This includes all earthwork. Construction of approximately 8,700 linear feet LF of underground stormwat
- Status
- Closed
- Sector
- Water Supply and Storage, Telecommunications, Government, Mass Transit, Waste Processing and Treatment, Power Generation (CCGT), Rail, Car parking, Commercial, Automotive
- Location
- Cameron, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Roadway with Associated Sidewalk Curb Ramps Striping
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of approximately 7,600 linear feet LF of roadway with associated sidewalk, curb ramps, striping, and railroad crossing. This includes all earthwork and revegetation. Construction of approximately 7,500 linear feet LF of power and telecommunication duct bank with associated manholes. This includes all earthwork. Construction of approximately 8,700 linear feet LF of underground stormwater infrastructure with associated junction box, curb inlet and headwall. This includes all earthw... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Cameron |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Telecommunications, Government, Mass Transit, Waste Processing and Treatment, Power Generation (CCGT), Rail, Car parking, Commercial, Automotive |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
