Roadways Paving Improvement
Sector: Stadium • Location: Pullman, Washington, United States of America
Source: Dodge USA
This project is intended to grind away the top 2" of existing asphalt and replace with new asphalt per design specs. This work will take place for approximately 1,400 linear feet of roadway along Stadium Way from Nevada Street to the entrance of the Smith Center Parking Lot. Stadium way is a 4-lane roadway with a concrete center median for most of this section.
- Status
- Closed
- Sector
- Stadium, Cement, Road, Car parking, Automotive, Commercial
- Location
- Pullman, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Roadways Paving Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is intended to grind away the top 2" of existing asphalt and replace with new asphalt per design specs. This work will take place for approximately 1,400 linear feet of roadway along Stadium Way from Nevada Street to the entrance of the Smith Center Parking Lot. Stadium way is a 4-lane roadway with a concrete center median for most of this section. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Pullman |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Stadium, Cement, Road, Car parking, Automotive, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
