Roadwork-Supply and Install 2 Steel Pipe Culverts
Sector: Steel • Location: Holdfast, Saskatchewan, Canada
Source: Dodge
SUPPLY AND INSTALLATION OF ONE 1 350 mm DIAMETER BY 32 m LENGTH AND ONE 1 050 mm DIAMETER BY 30 m LENGTH SMOOTH WALL STEEL PIPE CULVERTS BY THE BORING METHOD and DECOMMISSIONING OF 3 CULVERTS at various locations on Highway No. 2, near Penzance; for a TOTAL INSTALLATION LENGTH OF 62 m.
- Status
- Closed
- Sector
- Steel, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Metal
- Location
- Holdfast, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Roadwork-Supply and Install 2 Steel Pipe Culverts
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SUPPLY AND INSTALLATION OF ONE 1 350 mm DIAMETER BY 32 m LENGTH AND ONE 1 050 mm DIAMETER BY 30 m LENGTH SMOOTH WALL STEEL PIPE CULVERTS BY THE BORING METHOD and DECOMMISSIONING OF 3 CULVERTS at various locations on Highway No. 2, near Penzance; for a TOTAL INSTALLATION LENGTH OF 62 m. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Holdfast |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Metal |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
