logo

RoB on Kandla-Kutch Road

Sector: Bridge • Location: Gandhidham, Gujarat, India

Source: India Investment Grid (IIG)

Project
Closed

Information Deendayal Port Trust has come up with RoB on Kandla-Kutch Road with a ticket size of 272.69 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The proposed ROB cum Interchange is designed in such a way, that roads coming from

Project Information FAQ

Project Information

5 Q
The project “RoB on Kandla-Kutch Road” is an infrastructure initiative in the Bridge sector, located in Gandhidham, Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Deendayal Port Trust has come up with RoB on Kandla-Kutch Road with a ticket size of 272.69 INR Crores. This project in Roads & Bridges sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The proposed ROB cum Interchange is designed in such a way, that roads coming from 5 destinations do not cross each other at same level. This arrangement facilitates uninterrupted traffic flow from all the destinations and also crosses the existing railway tracks through ROBs. The traffic terminating or originating from all roads will make continuous flows without any interruption of traffics after successfully commissioning of ROB project. And after construction of ROB and the permanent closure of LC-236, will provide free flow of traffic to and from the port and thus enormous saving in time and fuel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data