logo

Robert and Beverly Lewis Integrative Science Building, University of Oregon

Sector: Advanced Electronics • Location: United States

Source: Pharmaceutical Technology

Project
Closed

University of Oregon’s (UO) new Robert and Beverly Lewis Integrative Science Building (LISB) was opened in November 2012. Research facility University of Oregon, Oregon, US August 2010 November 2012 103,000 square feet $65m University of Oregon HDR and THA Architecture Lease Crutcher Lewis University of Oregon’s (UO) new Robert and Beverly Lewis Integrative Science Building (LISB) was opened in No

Project Information FAQ

Project Information

5 Q
The project “Robert and Beverly Lewis Integrative Science Building, University of Oregon” is an infrastructure initiative in the Advanced Electronics sector, located in United States. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

University of Oregon’s (UO) new Robert and Beverly Lewis Integrative Science Building (LISB) was opened in November 2012. Research facility University of Oregon, Oregon, US August 2010 November 2012 103,000 square feet $65m University of Oregon HDR and THA Architecture Lease Crutcher Lewis University of Oregon’s (UO) new Robert and Beverly Lewis Integrative Science Building (LISB) was opened in November 2012. Named after the university’s alumni, Robert and Beverly Lewis, the new facility was built at a cost of $65m. The facility will carry out cutting-edge, interdisciplinary research activities. It will be home to biologists, psychologists and researchers of various disciplines. Research activities form a core part of UO’s functions. In 2011, the university sponsored $120m in research activities which fostered innovations. This in turn generated about $7.9m revenue through licensing for the university. These activities also supported the Oregon economy and generated new jobs. The LISB will help in further expanding the university’s research activities. It will address the need for additional research space required due to increase in enrolment and sponsored research activities. The facility will enable researchers to focus on individual as well as collaborative research activities. It will bring different groups of researchers together to carry out fundamental research starting from cellular processes to finding cures for major ailments. LISB is located within the university’s Lorry I. Lokey Science Complex. It links all the other science buildings in the complex including Lokey Laboratories, Huestis Hall, Streisinger Hall and Klamath Hall. LISB is spread over an area of 103,000ft2 and includes five levels. Four levels are above ground and include laboratories, 46 faculty offices, wet and dry labs, ERPS booths, meeting areas and office space. About 30,000ft2 of laboratory space in the facility is dedicated for life and materials sciences. The underground level houses mechanical equipment. The facility has been designed to encourage collaboration between researchers. The labs have an open layout design with shared laboratory facilities. All the walls and doors of the building are made of glass enabling equipment and facilities to be viewed from outside. The atrium has glass walls and stadium style seating. The walls double up as a whiteboard inviting participation and sharing of ideas. LISB houses the Support Network for Research and Innovation in Solar Energy (SuNRISE), the Center for Sustainable Materials Chemistry (CSMC), and the Robert and Beverly Lewis Center for NeuroImaging. SuNRISE is an instrumentation facility which can be used by industrial and academic clients for a fee. The CSMC will carry out green chemistry research. The NeuroImaging centre will carry out research in cognitive neuroscience and other disciplines. It is equipped with a Siemens MAGNETOM Skyra 3T magnetic resonance imaging (MRI) scanner, which can carry out full body scans. The scanner weighs nearly 12,716lbs and was installed by removing an exterior wall of the facility. It cost about $2.7m and will be used to carry out neuroscience research. About $30m of the funding for the LISB came in through Article XI-G bonds, which is the biggest G-bond investment made in the university’s history. The remaining $35m came in the form of grants and private donations. Donors included Robert and Beverly Lewis ($10m), Lorry I Lokey, William Swindells, the James R Kuse Family Foundation and Rosaria Haugland. The MRI scanner was partly funded by a federal grant provided by the Telemedicine and Advanced Technology Research Center (TATRC). Construction of a new neurosciences research building at Indiana University (IU) was initiated in August 2012, and is scheduled to be completed by 2014. It is located near 16th Street and Senate Avenue, near the IU Health Methodist Hospital. LISB has been built according to Leadership in Energy and Environmental Design (LEED) Platinum standards. It makes extensive use of natural daylight and features a green roof. The roof includes a heat recovery unit which recovers heat from exhaust air. The majority of the heat required by the building is provided by the unit. A total of 28 solar panels are also installed on the roof top for preheating water. The building is fitted with chemical fume hoods featuring automatic sashes. The sashes automatically close when idle and conserve energy by reducing exhaust flow. Bamboo has been used for majority of the wood finish works in the facility. The energy usage by the building is reduced through use of chilled beams and radiators. Other sustainable features include building control and daylight sensors, green lights, and reclaimed water usage. HDR and THA Architects were the architects for the building. The construction manager was Lease Crutcher Lewis. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data