Robert E. Gross Park Ballfield Lighting Modernization
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Modernize ballfield lighting with energy-efficient Light Emitting Diode (LED) systems at Robert E. Gross Park. Replacing the current metal halide lighting with an energy-efficient LED system will provide utility and maintenance cost savings, improve visibility on the field, create a safer play environment for users, and reduce light spillover into surrounding residential areas. The estimated reduc
- Status
- Prospective
- Sector
- Metal, Commercial, Car parking, Automotive, Manufacturing (Industrial), Residential, Power Transmission, Power Generation (CCGT), Government
- Location
- Burbank, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Robert E. Gross Park Ballfield Lighting Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Modernize ballfield lighting with energy-efficient Light Emitting Diode (LED) systems at Robert E. Gross Park. Replacing the current metal halide lighting with an energy-efficient LED system will provide utility and maintenance cost savings, improve visibility on the field, create a safer play environment for users, and reduce light spillover into surrounding residential areas. The estimated reduction in energy costs is 40 percent compared to typical 1500W metal halide systems, further loweri... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Burbank |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Car parking, Automotive, Manufacturing (Industrial), Residential, Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
