Roberts Bank Terminal 2 PPP project in Vancouver

Sector: Seaport • Location: British Columbia, Canada

Source: InfraPPPWorld

Project
Closed

The Roberts Bank Terminal 2 project is a proposed new three-berth container terminal at Roberts Bank in Delta, Metropolitan Area of Vancouver, B.C., on Canada's west coast. The project would provide 2.4 million twenty-foot equivalent units of container capacity per year. The terminal would be located in deep, subtidal waters to minimize environmental effects. The project involves the development o

Project Information FAQ

Project Information

5 Q
The project “Roberts Bank Terminal 2 PPP project in Vancouver” is an infrastructure initiative in the Seaport sector, located in British Columbia, Canada. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Roberts Bank Terminal 2 project is a proposed new three-berth container terminal at Roberts Bank in Delta, Metropolitan Area of Vancouver, B.C., on Canada's west coast. The project would provide 2.4 million twenty-foot equivalent units of container capacity per year. The terminal would be located in deep, subtidal waters to minimize environmental effects. The project involves the development of the terminal superstructure and equipment and the subsequent operation of a new marine container terminal for a period of up to 40 years. The preferred bidder will be responsible for terminal facilities, equipment, and ongoing container handling operations.The project will be procured on two separate contracts:First, a contractor will be selected through a design-build (DB) approach to build the new landmass and wharf needed for the project;Then, approximately three years prior to the anticipated start of terminal operations, the terminal operator will be selected through a terminal concession (TC) approach.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data