logo

ROBERTS DRIVE FM DUNWOODY PLACE TO SUMMER CROSSING - PHASE I

Sector: Power Transmission • Location: Sandy Springs, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

8/11/25: Located in the City of Sandy Springs along Roberts Drive, beginning at Dunwoody Place and ending at Island Ford Parkway (programmed to end at Summer Crossings). The project would build a 12-foot-wide shared use path with a 5-foot-wide landscaped buffer and a minimum of 1 foot back of path buffer on the south/east side of Roberts Drive. The project is approximately 0.6 miles. Other element

Project Information FAQ

Project Information

3 Q
The project “ROBERTS DRIVE FM DUNWOODY PLACE TO SUMMER CROSSING - PHASE I” is an infrastructure initiative in the Power Transmission sector, located in Sandy Springs, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

8/11/25: Located in the City of Sandy Springs along Roberts Drive, beginning at Dunwoody Place and ending at Island Ford Parkway (programmed to end at Summer Crossings). The project would build a 12-foot-wide shared use path with a 5-foot-wide landscaped buffer and a minimum of 1 foot back of path buffer on the south/east side of Roberts Drive. The project is approximately 0.6 miles. Other elements include street trees; midblock pedestrian crossings at Pride Place & at Island Ford Park; pedestrian lighting. The project crosses US19/SR400 utilizing an existing traffic bridge (PI 0001757). ENV: PCE assumed; minimal NPS coordination anticipated. ROW: 8 +/- assumed. UTL: minor relocations assumed. RR: No. Other: Traffic Engineering required due to proposed midblock pedestrian crossings.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data